Our project portfolio
Guildmore
Cladding investigation, remediation, and installation.
The Ropeworks is an 8 story U shaped mixed-use development located in Barking. The block consists of 246 home block of flats, police station, children’s nursery and a library.
The Works include removal of existing non-compliant HPL Trespa Meteon, EWI Render systems and Support framework together with Monolithic Aluminium panels and Balcony Decking. And replacement with compliant system and monolithic aluminium panels systems (comprising Mineral wool Insulation, breather membrane, fire barriers at floor slab and windows, EPDM to windows, new CP Boards, VCL, balcony capping and panels)
£2,200 000
High rise residential
14000sq/m
Guildmore Façade and Cladding
Cladding investigation, remediation, and installation
A prestigious scheme compromising of 7 blocks opposite City Airport.
Replacement of unsafe Non-ACM Cladding , Spandrel Panels, Terracotta and Decking with compliant Class A2-s1 , A2 Spandrel Panels, Terracotta and Aluminium Cladding. As well removal of combustible EWI on all 7 blocks
£5 million
Residential
15000sq/m
Guildmore
Replacement of combustible cladding
A very prestigious scheme located in Kensington, replacement of cladding on the penthouse areas.
Removal of EPS combustible panels ,installing a new complaint system. This is including Mineral wool Insulation, breather membrane, fire barriers at floor slab and windows, EPDM to windows, new CP Boards, VCL, balcony capping and panel.
£650 K
Residential
1200sq/m
Guildmore
Replacement of combustible cladding, including HPL panels , spandrel panels and aluminium decking.
Removal and installation a new complaint system on the car park soffits.
A luxury mixed use development comprising 278 apartaments and commercial units along Royal Greenwich River Thames Walk.
Includes removing combustible cladding and balcony soffits, replacing them with non-combustible materials for enhanced fire safety and replacement of granite stone.
£1.8 mil
Residential
17000sq/m
Guildmore
Replacement of combustible cladding, including HPL panels, spandrel panels and aluminium decking. Removal and installation a new complaint system on the car park soffits.
It is a residential building comprising 161 flats, located in Harrow.
Removal of EPS insolation into the car park areas
This is including Mineral wool Insulation, breather membrane.
As well installation of new Metaline panels and MyDeck system on the balconies.
£510K
Residential
2000sq/m
Aston
Removal of the existing EWI cladding and watertight the building until new cladding is installed.
Fred Wigg and John Walsh tower blocks, in Leytonstone, consist 232 homes.
Removal of EPS insolation into the car park areas applying new waterproof membrane around the openings.
£900 K
Residential
8000sq/m
Simple contact form
Our project portfolio
Guildmore
Cladding investigation, remediation, and installation.
The Ropeworks is an 8 story U shaped mixed-use development located in Barking. The block consists of 246 home block of flats, police station, children’s nursery and a library.
The Works include removal of existing non-compliant HPL Trespa Meteon, EWI Render systems and Support framework together with Monolithic Aluminium panels and Balcony Decking. And replacement with compliant system and monolithic aluminium panels systems (comprising Mineral wool Insulation, breather membrane, fire barriers at floor slab and windows, EPDM to windows, new CP Boards, VCL, balcony capping and panels)
£2,200 000
High rise residential
14000sq/m
Guildmore Façade and Cladding
Cladding investigation, remediation, and installation
A prestigious scheme compromising of 7 blocks opposite City Airport.
Replacement of unsafe Non-ACM Cladding , Spandrel Panels, Terracotta and Decking with compliant Class A2-s1 , A2 Spandrel Panels, Terracotta and Aluminium Cladding. As well removal of combustible EWI on all 7 blocks
£5 million
Residential
15000sq/m
Guildmore
Replacement of combustible cladding
A very prestigious scheme located in Kensington, replacement of cladding on the penthouse areas.
Removal of EPS combustible panels ,installing a new complaint system.This is including Mineral wool Insulation, breather membrane, fire barriers at floor slab and windows, EPDM to windows, new CP Boards, VCL, balcony capping and panel.
£650K
Residential
1200sq/m
Guildmore
Replacement of combustible cladding, including HPL panels, spandrel panels and aluminium decking. Removal and installation a new complaint system on the car park soffits.
It is a residential building comprising 161 flats, located in Harrow.
Removal of EPS insolation into the car park areasThis is including Mineral wool Insulation, breather membrane. As well installation of new Metaline panels and MyDeck system on the balconies.
£510K
Residential
2000sq/m
Guildmore
Replacement of combustible cladding, including HPL panels , spandrel panels and aluminium decking.Removal and installation a new complaint system on the car park soffits.
A luxury mixed use development comprising 278 apartaments and commercial units along Royal Greenwich River Thames Walk.
Includes removing combustible cladding and balcony soffits, replacing them with non-combustible materials for enhanced fire safety and replacement of granite stone.
£1.8 mil
Residential
17000sq/m
Aston
Removal of the existing EWI cladding and watertight the building until new cladding is installed.
Fred Wigg and John Walsh tower blocks, in Leytonstone, consist 232 homes.
Removal of EPS insolation into the car park areas applying new waterproof membrane around the openings.
£900K
Residential
8000sq/m
Simple contact form